AmP IQ

Aviation Maintenance Insight & Intelligence

 
 
IMG_7487.jpg

1: De-Ice Boot Damage

De-Ice boot damage as small as a pin hole or a tiny cut can mitigate performance. De-ice pneumatic wear can occur whether your aircraft is in the air, on the ramp, in storage and whenever the boot cavity fills with air. AmP performs meticulous De-Ice mechanism inspection and repair for every client.